Project Description
We prioritize safety and emergency response capabilities with the floating concrete pier we have specially developed for the Bitlis Marine Police. Berthing of Ares Class Boats Designed to enable the officer on duty to intervene quickly in emergency situations, this pier is an ideal solution for Police Boats. Our floating concrete scaffolding has a height of 1.25m, a width of 3m and a length of 15m and has an impressive weight capacity of 700 tons per m². Designed specifically for the needs of the Bitlis Marine Police, this pier accelerates emergency response and increases the capacity to respond to incidents quickly and reliably.